Planning the Order of a Whole-Home Remodel

When you're remodeling more than one room, the order matters. Some work has to happen before other work, and getting the sequence right keeps the project moving.

Mechanicals come first — the things behind the walls. Wiring, plumbing, and any structural work happen while the walls are open, before the drywall goes in. Doing the kitchen and a bathroom at the same time can make sense if they share a plumbing wall.

From there, the work moves from rough to finished: drywall, then paint, then floors, then cabinets and fixtures. Finishes go in last so they don't get damaged by the dust and traffic of the earlier stages.

If you're phasing the work room by room, the order is about living with it — which room can you be without, and for how long. We plan the order with you at the estimate, whether you're doing it all at once or in phases.

Free Estimate

Ready to talk through your project?

Send the form and we'll reach out to talk through the scope and set up your free estimate.

  • 1You send the form.
  • 2We reach out to talk through the project.
  • 3We look at the space and put the scope in writing.
  • 4You decide.

Form not loading, or prefer to talk? Call (612) 441-4217.

Call (612) 441-4217Free Estimate